Application Status

For sustainable integrity and safety management.

Meaning of the Symbols

check
All is well
clock
Under Maintenance
warning
Degraded
warning (1)
Partial Outage
minus-button
Outage
Maintenance Spend Planning

Provider:

AsInt’s Safety Suite

Provider:

AsInt IntelliSuite

Provider:

AsInt, Inc.

Events and Calibrations

Provider:

SAP

SAP BTP

Risk Based Inspection (RBI)

Provider:

AsInt, Inc.

SAP BTP

Analytics

Provider:

AsInt, Inc.

SAP BTP

Mobile CORE Calculator

Provider:

AsInt, Inc.

IOS/Android/Windows

Data Conduit

Provider:

www.asint.net

Digital Wall Chart

Provider:

AsInt, Inc.

SAP BTP

Inspections

Provider:

AsInt, Inc.

SAP BTP

Condition Monitoring Locations (CMLs)

Provider:

AsInt, Inc.

SAP BTP

High Consequence Area (HCA)

Provider:

AsInt, Inc.

SAP BTP