Optimize Integrity Programs with Risk-Based Engineering

Improve inspection effectiveness, reduce unnecessary maintenance, and manage equipment risk with proven engineering methodologies aligned to API 580, API 581, and ASME standards.

Service Components

What We Offer

A comprehensive suite of risk-based integrity engineering services - from foundational RBI implementation to advanced fitness-for-service assessments - covering the full asset integrity spectrum.

01

Risk-Based Inspection (RBI)

  • API 580 / API 581 RBI implementation
  • RBI model development and configuration
  • Inspection interval optimization
  • RBI revalidation and evergreening

02

Corrosion & Damage Mechanism Management

  • Damage Mechanism Reviews (DMR)
  • Circuitization and process stream analysis
  • Corrosion monitoring strategy design
  • Corrosion rate analysis and CML optimization

03

Fitness-for-Service & Life Assessment

  • Remaining life studies
  • Crack growth analysis
  • Life extension studies
  • FFS evaluations per API 579 / ASME FFS-1

04

Equipment Integrity Programs - Asset Coverage

  • Pressure Vessels & Columns, Heat Exchangers & Bundles
  • Above-Ground Storage Tanks
  • Fired Heaters & Boilers, Process & Plant Pipelines
  • Inspection-Critical Static Equipment

Our Methodology

How We Deliver RBI Programs

A structured, repeatable delivery model built on industry standards - engineered for practical implementation, not just documentation.

Why Methodology Matters

RBI programs fail not because of bad intentions - but because of inconsistent execution, poor data foundations, and models that are never revalidated. Our structured approach prevents all three.

100%

API 580/581 Aligned

6–12

Weeks to First Results

Ongoing

Sustainment Support

Icon for Data Collection & Asset Register Review

Phase 1

Data Collection & Asset Register Review

We gather existing inspection records, process data, equipment drawings, material specs, and historical corrosion data. A structured data quality review identifies gaps before modelling begins.

Asset RegisterInspection HistoryP&IDsMaterial Data
Icon for Damage Mechanism Review & Circuitization

Phase 2

Damage Mechanism Review & Circuitization

Our engineers identify active and credible damage mechanisms for each circuit and component - the foundation of any robust RBI model. We document corrosion loops and assign mechanisms per API 571.

API 571 DMRCircuitizationProcess Chemistry
Icon for RBI Model Development & Consequence Analysis

Phase 3

RBI Model Development & Consequence Analysis

We build the RBI model, calculate probability of failure (PoF) and consequence of failure (CoF) for each component, and generate the risk matrix. Both qualitative and quantitative approaches are supported.

API 581 QuantitativePoF / CoF MatrixRisk Ranking
Icon for Inspection Plan Development & Interval Optimization

Phase 4

Inspection Plan Development & Interval Optimization

Risk-ranked components drive optimized inspection plans - specifying scope, technique, frequency, and CML locations. High-risk assets get more focused attention; low-risk assets are safely extended.

Inspection ScopeNDE Method SelectionCML Optimization
Icon for Ongoing Revalidation & Evergreening

Phase 5

Ongoing Revalidation & Evergreening

An RBI model is only as good as its last update. We establish governance and workflow for routine revalidation after inspections, process changes, or turnarounds - keeping the model live and trusted.

Revalidation TriggersGovernance ModelManaged Support

Business Value

What You Gain

Measurable business outcomes that go beyond regulatory compliance - driving real operational and financial performance improvements.
Icon forBetter Risk Visibility
Better Risk Visibility

Replace gut-feel inspection decisions with a structured, data-backed risk model that shows exactly where failure risk is highest.

Icon forMore Effective Inspection Planning
More Effective Inspection Planning

Focus inspection resources where they matter most - reducing wasted effort on low-risk assets while strengthening coverage of high-risk ones.

Icon forLower Integrity-Related Cost
Lower Integrity-Related Cost

Reduce unnecessary inspection spend, eliminate over-maintained equipment, and avoid costly reactive repairs through proactive risk management.

Icon forImproved Asset Life Management
Improved Asset Life Management

FFS assessments and life studies allow confident run-life extensions - safely maximizing the value of aging assets beyond original design limits.

Need help modernizing your RBI program?

Whether you're starting from scratch or improving an existing program, our team can assess your current maturity and build a practical roadmap.

Explore Other Services

Ready to Build a Risk-Driven Integrity Program?

Whether you're implementing RBI for the first time or improving an existing program, AsInt brings the engineering expertise, methodology, and digital tools to deliver real, lasting results.

    Request a Demo